ADU Permitting

Permit preparation brings the design into a form that local reviewers can assess. A clear record of submissions and responses makes the next step easier to see.

View the field notes ↓
A scale model, plan sheets, pencil and ruler on an architectural drawing table.
NUVO design archive / Concept imagery
01 / Property study

Which version is ready for review?

Choose one place to keep the dated drawing set, comment log and response owner. Separate approved documents from working copies.

A glazed studio entrance occupies the opening of a former garage.
Describe the existing structure and proposed change together. Concept study
02 / Design considerations

Keep revisions coordinated.

Cedar-clad addition meeting a stucco home beside a sheltered side entry.
Design considerations Concept study
01

Identify the reviewing office

Start with the property address and jurisdiction. Confirm the relevant submission instructions and document list for the actual proposal.

02

Assemble a consistent set

Check that plans, site information and consultant drawings describe the same project. Agree who will submit the package and receive review correspondence.

03

Follow comments to a resolution

Log each review comment, the person responsible and the drawing or response that addresses it. Keep the latest issued set separate from working drafts.

Separate front doors open onto a shared residential courtyard and garden path.
03 / Design study

Show how the property operates.

Label the existing entrances, shared paths and proposed dwelling on the same site plan. Bring any uncertainty about the address or project description to the reviewing office.

Illustrative architectural concept
04 / Homeowner questions

ADU Permitting
FAQs.

Which office should we ask about an ADU permit?

Confirm the parcel’s jurisdiction with the local planning directory and boundary map. A property outside incorporated city limits generally goes to Santa Clara County. Give staff the address and parcel number so they can confirm who reviews it.

What should I say in my first message to the permit counter?

Describe the existing home, the proposed project type and whether you are using an existing structure. Ask for the current submittal checklist, the right application portal and a contact for site-specific questions.

Why might a detached home and a garage conversion need different materials?

A conversion raises questions about the building already there, while a new detached unit needs a proposed location and connections. Give staff the actual scope so they can identify the applicable drawings and supporting information.

Can I take a pre-approved plan straight to a builder?

Ask the local plan program which portions it has reviewed, whether the plan owner must authorize use, and what site-specific work remains. Confirm how adjustments to the standard design would affect its review path.

What is worth checking before the plans are uploaded?

Match the parcel number, project description and revision dates across forms and sheets. Have the designer check that dimensions and equipment locations agree across architectural and consultant drawings. Use the file naming and signature instructions from the reviewing office.

How can I keep track of fees without guessing the final amount?

Ask the office which fee schedules apply, when each fee is due and whether separate agencies may charge for utilities or other reviews. Keep dated estimates separate from amounts already invoiced or paid.

Who should receive questions after submission?

Agree on the applicant and a single contact who can receive correspondence and route it to the right consultant. Keep the application number, receipt and submitted files together so everyone can find the same set.

How should we handle a list of plan-review comments?

Make one entry for each comment with the reviewer’s wording, the responsible person and the sheet where the response appears. Have the team check the complete response package before resubmitting.

What if we want to change the design after approval?

Show the proposed change to the designer and reviewing office before asking the crew to build it. Ask whether a revision must be submitted, and record any effect on inspections, cost or timing.

What records should we keep when permit work is complete?

Ask the reviewing office what documents show final sign-off for your project and how to retrieve them. Keep the approved set, approved revisions, inspection records and closeout documents with your property records.

05 / Your next step

Bring your site into focus.

Keep your notes together for the first property conversation.

Build your property brief ↗