Multifamily & Duplex Projects

On a property with several households, a new home changes shared routines. Start with the entrances, paths and services that everyone already depends on.

View the field notes ↓
Separate front doors open onto a shared residential courtyard and garden path.
NUVO design archive / Concept imagery
01 / Property study

How do residents move through the site?

Trace bins, deliveries and pedestrian routes. Mark the access that must stay open while work is underway.

A planted side path passes a bench on the way to a separate front door.
Walk the access routes residents use today. Concept study
02 / Design considerations

Plan around occupied homes.

An exterior stair reaches a timber-clad studio above a single-car garage.
Design considerations Concept study
01

Map life on the property

Record occupied units, common spaces, bin storage, parking and deliveries. Identify the routes residents need to keep using throughout a project.

02

Separate the project options

An additional dwelling and a broader redevelopment can follow different review paths. Bring the current unit count, available records and proposed scope to a jurisdiction-specific review.

03

Prepare for occupied work

Discuss access, noise, temporary utility interruptions and communication with residents. A useful concept shows how the property functions during construction as well as afterward.

A scale model, plan sheets, pencil and ruler on an architectural drawing table.
03 / Design study

Make room for construction access.

On a second copy of the site plan, mark material deliveries, staging and the resident route that needs to stay open. Use it to brief the project team before work begins.

Illustrative architectural concept
04 / Homeowner questions

Multifamily & Duplex Projects
FAQs.

What information should an owner assemble before the first sketch?

Collect the recorded parcel information, available permits, existing unit count and floor plans. On a site sketch, differentiate occupied homes, shared facilities, parking and areas whose approved use still needs to be confirmed.

How do we distinguish an ADU proposal from a duplex or redevelopment project?

Describe the existing approved use and exactly which spaces or units would be added, altered or removed. Ask the reviewing jurisdiction to identify the applicable route for each option before comparing a price or schedule.

Which underused spaces are worth investigating?

Start with storage rooms, detached structures and underused paved areas. Record who uses each space and its access, daylight, ceiling height and service connections. An apparently empty space may support several households.

How do we compare converting an existing area with building a detached unit?

Use the same room brief for both options. Compare displaced amenities, resident access, service connections, outdoor space and construction staging alongside the proposed floor area.

How can construction access coexist with occupied homes?

Trace delivery vehicles, tradespeople and residents on separate overlays. Identify any shared gate or pinch point and discuss temporary fencing, delivery hours and a continuously available resident route.

What should a utility investigation cover on a multi-unit property?

Map meters, panels, shutoffs, service lines and the units or common areas they serve. Ask providers and consultants to confirm capacity, access for maintenance and which households any connection work could interrupt.

What happens to bins, bicycles and shared laundry?

Inventory each facility and follow the route residents use to reach it. If a proposal removes or relocates a facility, draw its replacement and check that collection crews or maintenance staff can still reach it.

How can each front door be easy to find?

Sketch a first-time visitor’s walk from the street to each unit. Check lighting, visible door identification and a place to pause that keeps another home’s entrance clear.

What should a resident communication plan include?

Name one point of contact and agree how residents will receive schedule changes, entry requests and utility notices. Confirm applicable notice requirements with the appropriate adviser before setting work dates.

What should be resolved before construction is phased?

For each phase, list the homes that remain occupied, routes that must stay open, inspections to clear and services to restore. Ask the team to identify which tasks can overlap and which must finish before the next area is disturbed.

05 / Your next step

Bring your site into focus.

Keep your notes together for the first property conversation.