Home  /  Santa Clara County  / Los Gatos
Santa Clara County / City guide

Los Gatos ADU Services

Los Gatos offers an ADU/JADU application and a gallery of plans. If a gallery design is close to what you want, work out which changes matter before committing to the plan.

Plan for your property ↓
A sheltered courtyard beside a low garden home
NUVO architectural study · Design concept
01 / Getting started

Planning an ADU in Los Gatos

01

Describe the proposed work

Label the existing house, the areas being retained and the proposed new dwelling. Use the Town’s ADU/JADU application to organize the submission.

02

Keep a revision list

The Town flags customization as a factor in using a gallery plan. Ask how moving an opening or changing the roof affects the review.

03

Test how the buildings meet

For an attached option, draw the shared wall and roof junction. For a detached option, show the space between both homes.

A study of the junction between roof forms
NUVO field study · Design concept
02 / On the property

A window change worth discussing early

On a copy of the candidate floor plan, circle the window that faces the main bedroom. Compare screening it with moving it. Send both options to the plan provider before changing the construction set.

ADU permitting ↗
03 / Local desk

Official resources

Town ADU information and plans gallery Los Gatos ADU/JADU application and guidelines
04 / Homeowner questions

Los Gatos ADU questions

Where do I get the Los Gatos application?

Use the ADU/JADU application linked from the Town’s ADU information page.

Can I look at plans before contacting a designer?

The Town links to its plans gallery. Keep the plan identifier and your list of questions together.

What if I want a different kitchen or window?

Mark the change on a copy of the plan. Ask the provider and Town how it affects the proposed review path.

How can I compare attached and detached entrances?

Trace both routes from the street and identify any shared gate, narrow turn or window beside the path.

Who should coordinate changes to borrowed plans?

Ask the provider who may revise the drawings and who will supply the site-specific sheets.

What should I bring if I am considering a JADU?

Show the existing floor plan and mark the space you want to convert, the potential entry and the connection to the house.

What do I record at the roof junction?

Photograph the roof edge, gutters and nearby windows so the designer can examine drainage and daylight.

What is a useful first email to Planning?

Include the address, project type and the single change you are unsure about. Attach one labeled sketch.

How can I avoid comparing two different scopes?

Ask for plan licensing, revisions, site work and permit coordination as separate line items.

Which records belong in the project folder?

Keep the Town application, the dated plan version, responses to your questions and each revised drawing together.